Concrete mixing
Your current location: 首 页 > Hot push information

Bazhong professional concrete mixer picture

2022-09-25
Bazhong professional concrete mixer picture

巴中专业Concrete mixerHigh efficiency, low energy consumption, high reliability, easy maintenance Equipped with multiple shaft end sealing protection device and air pressure sealing protection device, effectively prevent leakage phenomenon。The unique mixer monitoring system can monitor the working status of the gearbox, discharge pump and electric lubricating oil pump at any time。Equipped with DC24V concrete mixer special centralized lubrication pump, the running time can be programmed independently, waterproof, dustproof, excellent performance。Multi-pipe and multi-channel sprinkler system, water can be evenly sprayed。Concrete mixer图片The whole machine reformed the model design, stable operation。Equipped with enhanced gearbox, strong load capacity, longer service life。

Bazhong professional concrete mixer picture

The purpose of concrete mixing is to make each component of concrete mixed into a mixture of each material particle dispersed with each other and evenly distributed。Whether the mixed concrete has a uniform texture,专业Concrete mixer图片A certain number of samples can be randomly selected from the concrete for analysis to assess, if the mix ratio of each sample is basically the same, it can be considered that the concrete has been mixed evenly。In order to make the components of the concrete mixed evenly, it is necessary to disperse the particles of each component to the other components during the mixing process, therefore, it is necessary to try to make the components have movement, and make their movement track intersect, the more the number of intersecting, the easier the concrete is to mix evenly。According to the different methods of forcing each component to produce an intersecting motion trajectory, there are basically two mixing mechanisms based on the design of ordinary concrete mixers: 1.Self-falling diffusion mechanism: it is to lift the material to a certain height, using the effect of gravity, free fall, due to the height, time, speed, falling point and rolling distance of each material particle。Thus, the material particles interpenetrate, permeate and diffuse, and then achieve the purpose of uniform dispersion, because the dispersion process of the material is mainly the use of gravity, it is also called gravity diffusion mechanism, and the self-falling concrete mixer is designed according to this mechanism。2.Forced diffusion mechanism: It is the use of moving blades to force the material particles to move from all directions (circumferential, radial and vertical), so that the direction and speed of the movement of the material particles are different, resulting in shear slip between each other so that each material is interspersed and diffused, so that the material is evenly mixed。Concrete mixer图片Because the diffusion process of the material is mainly based on the shear slip effect between the material particles, it is also called shear diffusion mechanism。

Bazhong professional concrete mixer picture

HZS35 concrete mixing plant is a small concrete mixing equipment, the mixing plant adopts JS750 type double horizontal shaft forced mixing machine, special four-fold seal and electric oil pump technology, good mixing quality, high mixing efficiency, is the ideal choice for our customers。Installation Precautions 1.巴中专业Concrete mixerInstallation of the mixer machine: the bottom plane of the mixer chassis is properly raised,Attach the legs to the main engine with hinges,Install the cement scale,水秤,After weighing the admixture,Ready to lift,Measure and adjust engine chassis,Make it horizontal,After the center line of each leg coincides with the center line of the foundation, the anchor bolt can be poured into the reserved pit (or welded between the base and the reserved embedded part)..2. Installation of other parts: after the installation of the main engine and cement silo,Screw conveyor can be installed,Before hoisting,Check the filling of oil and grease at each lubrication point,An empty car running test is to be conducted,Find problems and solve them in time,Part of the dosing machine installation,Position as required by the foundation drawing,The small dosing machine can be placed on the solid foundation pier plane,Large batching machine requires pouring anchor bolts,After the installation of each mechanical part,Check that all lubrication points of various equipment are filled with lubricating oil (the lubricating oil suitable for low temperature conditions must be replaced in winter in Northeast China) or grease,Wiring and empty car running test can be conducted according to the requirements of the manual and electrical schematic diagram。3. The ground screw bolt of the cement silo is poured to the reserved pit of the foundation. When the center line of the cement silo support is adjusted to coincide with the center line of the foundation, the above four flanges are adjusted on the same level (measurement method: theodolite or transparent plastic hose with diameter of 8-10 and color water measurement method), the concrete can be selected for casting。The grade of the concrete used in the reserved pit should be one level higher than the concrete used in the foundation, and in the winter construction, in order to shorten the construction period, the concrete used should be added with early strength antifreeze。Wait for the foundation concrete to set 5-7 days before installing the cement silo body. When installing the cement silo body, it is necessary to measure the verticality of the cement silo body with a theodolite. The verticality is one thousandth of the height。In order to shorten the construction period,Concrete mixer图片In infrastructure, embedded parts can also be used to fix cement silos or mixers instead of anchor bolts。

Bazhong professional concrete mixer picture

1, concrete mixing plant construction site should have flood control, drainage systems and measures, the road should be kept unblocked。2, the foundation pit, the trough should have a system of drainage ditches, and should often check the stability of the soil wall of the mixing station to avoid the collapse of the soil。3. After brushing the template with spacer, it should be covered to prevent it from being washed by rain;If it is found that the spacer is washed by rain, it should be repainted and the concrete should be poured。4, cement shed and mixer shed should be checked frequently to prevent rain leakage。5, the water content of sand and stone should be often determined, and should be deducted from the water added in the mix ratio。6, mixing station rainy day transportation of raw materials and concrete, should be covered。7. Before pouring concrete, the water in the mold should be drained。8. If the open-air structure and components of the mixing station require continuous construction without construction joints, the awning should generally be set up。Otherwise, adequate cover and waterproof materials (such as tarpaulins, linoleum, etc.) should be prepared to cover in time to prevent rain erosion。专业Concrete mixer图片If the surface of the component is washed by rain, it should be smoothed again。9. Slope and bridleway should take anti-skid measures。10, mixing station electric machinery and wires, should be often checked by electricians whether leakage;专业Concrete mixer图片When leakage is found, the work should be stopped immediately for repair。

Bazhong professional concrete mixer picture

Concrete double horizontal shaft forced mixer is mainly used for mixing various powdered materials。Can produce a variety of powder mixing materials。Its aggregate can be wet fly ash, calcium carbide mud, phosphogypsum, sand, slag and so on。专业Concrete mixer图片It is mainly used as a supporting host for all kinds of standard brick, gray sand brick and other production lines。It is one of the important equipment in the production process of autoclaved fly ash brick and lime sand brick。Concrete double horizontal shaft forced mixer is mainly composed of shell, spiral shaft assembly, drive device, piping, cover plate, chain cover and other components (see the random external drawing) 1 专业Concrete mixer图片The shell is mainly composed of plate and section steel, welded and formed in the factory, and assembled with other components, which is the support of the two-shaft mixer。The shell is tightly sealed, and there will be no phenomenon of flying ash and leaking ash。2 Screw shaft assembly is the main component of double-shaft mixer, its components are mainly left and right spiral shaft, bearing seat, bearing sleeve, bearing cover, gear, sprocket, oil cup, blade and other parts。

标签

Previous post:Leshan affordable hopper use2022-09-25